I made it to office on time 6 50 and worked until almost 1. It was not too bad Cheri Nguyen is our new intern from Western. Came home and Ben is suppose to come at 12 but he didn't make it until 2.
Tomas, Juan and Miguel had finished he living room ceiling and was starting on the kitchen popcorn. Another guy came and loaded up a truck with all the stuff in the back yard. So much junk and took it to the dump somewhere near San Pedro or Torrance. They prolly took the stuff to the waste management company in Carson, as it accepts construction waste.
We picked the flooring, we picked SPC over LVP, as Ben said he cannot get material on time like CoreTec that we liked. Oh well. He will start flooring next week and should take about two days. Said he will bring two crews of three to do it quick and then it is the cabinets !!!
We took Deborah Perkins out to dinner at Ubon Thai over at Crossroad. The food was good a bit salty. Then we came home and went to bed. I was pretty tired.
No comments:
Post a Comment